Název: Power supply optimization for the superconducting coil system of HELIAS fusion reactor
Autoři: Gaupp, O.
Haller, R.
Harmeyer, E.
Mühlbacher, Jan
Wieczorek, A.
Wobig, H.
Citace zdrojového dokumentu: Proceedings of the Intensive Programme 2008. 1st ed. Pilsen: University of West Bohemia. Faculty of electrical engineering. Department of electrical power engineering and environmental engineering, 2008, s. 132-141. ISBN 978-80-7043-681-3.
Datum vydání: 2008
Nakladatel: University of West Bohemia. Faculty of electrical engineering. Department of electrical power engineering and environmental engineering
Typ dokumentu: konferenční příspěvek
conferenceObject
URI: http://home.zcu.cz/~tesarova/IP/Proceedings/Proc_2008/index.htm
http://hdl.handle.net/11025/22609
ISBN: 978-80-7043-681-3
Klíčová slova: fúzní reaktory;reaktivní síla;kvalita elektrické energie;zásoby energie;simulace;supravodivé magnety
Klíčová slova v dalším jazyce: fusion reactors;reactive power;power quality;power supplies;simulation;superconducting magnets
Abstrakt v dalším jazyce: A power supply system for feeding the superconducting coils of the Helias reactor, an upgraded system of Wendelstein 7X, has been investigated. These investigations on operation of the power supply of the fusion power plant were made using the SIMPLORER, EFFI and NEPLAN codes. This multiconverter supply system has been optimized, in view of low losses in the components and only little negative impact to the power grid. The design of the optimized multiconverter supply system was studied by means of computer simulations. The influence of the passive structures on operation of the power supply system was taken into account. The computation of induced eddy currents in the coil structure during transient processes are transformed into electric network analyses using the inductance and resistance data of the nonplanar coils and their coil housings, by means of the Finite Element Network (FEN) method. This approximation allows the investigation of the whole coil system including power supplies and passive structures. The new approach was to use an additional 80MW, 1.2GJ energy storage unit with the magnetic confinement system as a SMES in order to reduce network loadings to 80MW instead of 160MW in the power plant start-up phase during plasma heating. The reduction of the active power pulse loads reduces the risk of oscillating power frequency changes. These oscillations produce transient power flows which can danger the grid stability.
Práva: © University of West Bohemia
Vyskytuje se v kolekcích:Proceedings of the intensive programme 2008
Proceedings of the intensive programme 2008

Soubory připojené k záznamu:
Soubor Popis VelikostFormát 
Gaupp.pdfPlný text638,74 kBAdobe PDFZobrazit/otevřít


Použijte tento identifikátor k citaci nebo jako odkaz na tento záznam: http://hdl.handle.net/11025/22609

Všechny záznamy v DSpace jsou chráněny autorskými právy, všechna práva vyhrazena.