Title: | Sequence determining of construction of the offshore wind farm construction applying permutation method |
Authors: | Bagočius, Vygantas Kazimieras Zavadskas, Edmundas Turskis, Zenonas |
Citation: | E+M. Ekonomie a Management = Economics and Management. 2014, č. 3, s. 50-61. |
Issue Date: | 2014 |
Publisher: | Technická univerzita v Liberci |
Document type: | článek article |
URI: | http://www.ekonomie-management.cz/download/1411803184_6a31/05_SEQUENCE+DETERMINING+OF+CONSTRUCTION+OF+THE+OFFSHORE+WIND+FARM.pdf http://hdl.handle.net/11025/17568 |
ISSN: | 1212-3609 (Print) 2336-5604 (Online) |
Keywords: | pobřežní větrné turbíny;rozhodování podle více kritérií;metoda permutace;metoda AHP |
Keywords in different language: | offshore wind turbine;multi-criteria decision making;permutation method;AHP method |
Abstract in different language: | Ranking of work or feasible investments is one of high-importance keys for successful economic development. The share of renewable energy sources in the Lithuanian primary energy supply is on the lowest among EU. Only bio fuel, hydro and wind power can be considered as potential renewable energy sources in Lithuania at present time. Wind energy generation mature technology and comparatively low cost make it promising as an important primary energy source in the nearest future. The aim of this paper is to determine the sequence for the wind turbine construction in the waters of Lithuania. The key criteria set for was determined for the problem solution: area of the territory, water depth, distance to shore, average wind velocity, max power on the area, amount of energy per year, investments and CO2. AHP method is used to estimate criteria weights. The problem was solved applying multi-attribute permutation method. This method allows dealing with qualitative and quantitative as well as with linguistic (verbal) data. |
Rights: | © Technická univerzita v Liberci CC BY-NC 4.0 |
Appears in Collections: | Číslo 3 (2014) Číslo 3 (2014) |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
05_SEQUENCE DETERMINING OF CONSTRUCTION OF THE OFFSHORE WIND FARM.pdf | Plný text | 1,6 MB | Adobe PDF | View/Open |
Please use this identifier to cite or link to this item:
http://hdl.handle.net/11025/17568
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.