Title: | Návrh rekonstrukce malé vodní elektrárny na Berounce |
Other Titles: | Reconstruction proposal of small water power station on Berounka river |
Authors: | Aubrecht, Petr |
Advisor: | Škorpil Jan, Prof. Ing. CSc. |
Referee: | Bělík Milan, Ing. Ph.D. |
Issue Date: | 2021 |
Publisher: | Západočeská univerzita v Plzni |
Document type: | diplomová práce |
URI: | http://hdl.handle.net/11025/46051 |
Keywords: | vodní elektrárna;derivační vodní elektrárna;jezová vodní elektrárna;přivaděč;vodní turbína;elektrický generátor;hydrologické poměry;kompenzace;kritérium aktualizovaného zisku |
Keywords in different language: | hydroelectric power plant;derivative hydroelectric power plant;weir hydroelectric power plant;feeder;water turbine;electric generator;hydrological conditions;compensation;criterion of net present value |
Abstract: | Cílem práce je návrh rekonstrukce malé vodní elektrárny na řece Berounce. Úvodní část je zaměřena na seznámení s problematikou získávání elektrické energie z vodních zdrojů; dále je popsán současný stav elektrárny se současnými výkony dodávanými do distribuční sítě a možnostmi získávání informací o aktuálním výkonu a předpokládaném průtoku vody. Následuje návrh rekonstrukce, který se snaží maximálně využít povolené hydrologické poměry dané lokalitou. Pro navrhované řešení je vypočtena teoretická výroba elektrické energie generované novou elektrárnou. Poslední část hodnotí navrhované řešení po stránce ekologické, energetické a ekonomické. |
Abstract in different language: | The aim of this thesis is to design a reconstruction of a small hydroelectric power plant on the river Berounka. The introductory part of the thesis is focused on getting acquainted with the issue of obtaining electricity from a water sources. Furthermore, the present state of the power plant is described with the outputs supplied to the distribution network and the possibilities of obtaining information on the present output and predictingthe water flow. Next, the paper focuses on the design of the reconstruction, where the effort is to make maximum use of the permitted hydrological conditions of the site. For the proposed solution the theoretical production of electricity generated by the new power plant is calculated. The last part evaluates the proposed solution in ecological, energy and economic terms. |
Rights: | Plný text práce je přístupný bez omezení |
Appears in Collections: | Diplomové práce / Theses (KEE) |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
DP_Aubrecht.pdf | Plný text práce | 4,95 MB | Adobe PDF | View/Open |
PosudekVedoucihoSTAG.pdf | Posudek vedoucího práce | 37,33 kB | Adobe PDF | View/Open |
PosudekOponentaSTAG.pdf | Posudek oponenta práce | 35,7 kB | Adobe PDF | View/Open |
ProtokolSPrubehemObhajobySTAG.pdf | Průběh obhajoby práce | 23,36 kB | Adobe PDF | View/Open |
Please use this identifier to cite or link to this item:
http://hdl.handle.net/11025/46051
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.